Construction Management
• Coordination between many microprojects. Close cooperation with projects management and Head of DCS projects.
• Supervision during DCS demolition scope.
• Coordination and supervision during loop – checks.
• Site surveys and technical clarification between EPC contractor and Operations Team
• Preparation for next shut-downs.
• Planning and preparation for DCS controllers and other control devices movement to different cabinets. Site shutdown time optimalisation.

BP , Stork/FLUOR Germany Gelsenkirchen 
Troubleshooting / Commissioning Manager
• Daily coordination of subcontractor and DCS engineers and technicians during TAR – DCS system migration.
• Managing of troubleshooting team, work preparation and punch list analysis.
• Daily meetings with client regarding punch list and proposing solutions.
• Close cooperation with engineering department, problems clarification and solution finding.
• Active in the field helping problem solving, working with Schneider DCS engineers and screen operators.

Cargill , De Smet Engineers & Contractors (Poland and Belgium) 
E&I Leading Supervisor
▪ Representing client in front of subcontractor
▪ Daily construction coordination meeting
▪ Reply to RFI , MAF,
▪ Daily inspections and scope clarifications
▪ Approval of payment certificates and extra work costs
▪ RAMS review and approval.

ERC Emissions-Reduzierungs-Concepte GmbH

E&I Commissioning Deputy Manager

Acting as Commissioning Manager during start-up of SCR
installation on Vasilikos power plant in Cyprus. Daily tasks planning
for commissioning technicians and engineers. Coordination meetings with
all disciplines, client and third party project engineers. Organisation
of procedures, documents and being active part of commissioning team in
the field. Operating DCS.

TRS Staffing Solutions  –
Electrical and Instrumentation Supervisor

This time I was
working on data centre project for Fluor Corporation an EPC main
contractor.
My day to day duties are related to area coordination on
main substation. Preparation of work notification (work permit to access
client area) coordination of all disciplines in preparation to
installation new 220/22 kV transformer, new switchgears and all
infrastructure related to new installation.

Engie-Fabricom /
Siemens UK / Innogy – Triton Knoll
(Belgium-Antwerp) 

Deputy Construction Manager/
Electrical Supervisor/ Commissioning Permit
Coordinator

Follow up all electrical activities; Progress, quality control, safety supervision and controlling and calculating extra work.
Responsible of Work Permits / commissioning permits, RAMS,
tool box talks, Daily construction meetings with client and coordination
inside joint venture.
Supervision over subcontractor forces, work pack preparation and engineering/design clarifications.
Support during GISinstallation 220 kv and 66 kv.

E&I Inspector at Exxonmobil /
Fluor / Bureau Veritas

E&I Inspections , creation of reports,
checking newly build installation to Atex standards. Review of
quality documentation.
Witnessing electrical test’s (megger, hi-pot, grounding etc.)

Checking installation to IEC 60079…standards

EI&C Supervisor – BP / Actemium TAR
2017

Supervision during TAR 2017 (turnaround / shutdown)
at BP site in Europort. Working for subcontracted company Actemium
specializing in Electrical, Instrumental and Control systems. Daily
supervision of electricians, instrumentation technicians and steel
workers about 55 people (multinational environment) divided by 3
supervisors.
Daily planning scope of work for dedicated workforce.
Coordination between planning and quality department as well as with
other subcontractors. Checking discrepancy and finding solutions. Daily
progress reporting and planning ahead meetings. Preparation of
work-packs and quality control after accomplished tasks.

Site
Electrical Engineer / Supervisor – Saudi TKT Company Limited / Varian –
Proton Therapy System

Site Supervision during construction
phase of Proton Therapy System for Varian in King Fahad Medical City in
Riyadh. Under my supervision I have three working foremans and 25
technicians working on different systems starting from HV switchgears,
UPS, LV systems, instrumentation and controls, RF system and IT.
I’m
doing daily documentation clarification finding and proposing solutions
in technical matter. Identifying problems in documentation, checking for
changes, problems and variations in between documentation for
construction and installation instructions, master cable list, wiring
diagrams and cable schedules, checking documentation defects and looking
for clarification.

Dornan/Oradeo – Site Supervisor-DATA
CENTRE Project (Netherlands)

Supervision of 19 electricians
during construction phase of data center. Cable pulling, cable trays,
termination, inspections and quality checks, RAMS, Permits, toolbox
talks etc. Safety work planning, Logistic and coordination. Contact with
client and other contractors and trades.

SOCOTEC OIL &
GAS – Freelancer Electrical Inspector

ELECTRICAL
INSPECTIONS

Proofest International s.r.o. – Freelancer
Electrical Inspector

ELECTRICAL INSPECTIONS

RINA
– Freelancer Inspector / Auditor

Inspections and audits in
construction companies. Certification checking and approving. Checking
ISO standards and procedures.

INTERTEK – Freelancer
Electrical Inspector

Inspections of electrical equipment.
Checking documentation. Witnessing tests. Creating reports. FAT. SAT. GE
– approved inspector.

BILFINGER/BABCOCK NOEL – PGE Power
Plant Turow – Commissioning Engineer, Guaranty Engineer on installation
of FGD – flue gas desulphurization (Germany and Poland) E&MSR&ICA Engineering

Duties include: Technical support
during construction phase, consultations, supervision of subcontracted
forces, commissioning, meetings with client, translation and explanation
of technical documentation, providing a training for operators, dealing
with faults and punch list, arranging repairs with subcontractors and
keeping right documentation flow. Inspections,
FAT.

PETROFAC/TOTAL Gas Plant – Site supervisor (Shetland
Island’s UK)

Duties include: Daily base technical drawings,
specifications analysis. Site documents preparation with required
updates. Assemblies and material check. Fabrication and site erection
overall supervision. Daily progress, safety and quality reporting.
General supervision on the task and dedicated labor
forces. 

TAQA ENERGY / FLUOR Gas storage
plant – Instrumentation Technician, QA/QC Inspector.
(Netherlands)

Duties include: Testing and commissioning of
instrumentation, control system DCS and PLC’s, UPS/Batteries, LV
Switchboards, Cables, at newly build gas storage plant. Electrical
installation quality checking to ATEX standard.

Permasteelisa
Gartner Qatar – MEP Supervisor Electrical supervisor
(Qatar)

Duties include: Electrical supervision of the
subcontractor on the newly built airport in Doha-Qatar. Drawing
checking, consultations, coordination, helping in design, technical
clarification, quality control, commissioning, supervision of special
systems ELV: light control systems, access control, fire alarm, HVAC,
BMS, public address, Voice and Data, UPS and CCTV. (Up to 120
electricians, foremen, supervisor’s)

Advance Solution
Engineering – Project Manager (Slovakia)

Duties include:
supervision the development of an automated warehouse project for NGK
factory in Gliwice. Creation of electrical department for project
purposes – design team and installation team. Coordination between
mechanical department, electrical department, client and
suppliers.

Voith India – Daimler India – Electrical
Supervisor European Expert (INDIA)

Duties include: Providing
a training for local contractors, supervision in quality aspect, fault
finding, testing and commissioning, rectifying faults, supervision of
facility management team HV and LV systems, UPS and Diesel
Generator.

Self-employed – Project – Site Management,
Supervision (Poland)

Duties included: All aspects of
electrical work industrial and civil, LV Switchboards, HVAC, intelligent
house, lights. Projects management and supervision. Circuit design.
Testing and inspections, pre-commissioning and commissioning of control
systems, sensors and instruments.

ABB Sunderland – Working
foreman (UK)

Duties include: Wiring control panels, LV
switchgears, assisting during tests and commissioning, preparing
production, consultations with senior engineers.

Wirac
Automation Ltd. – Electrical Supervisor (UK)

Duties include:
All aspects of electrical work industrial wiring (gas & oil), panel
building and design, electrical and mechanical fitting, designing
electrical circuits, programming PLC’s, supervising installation team,
testing and commissioning of control systems and
instrumentation.

Promat Power Services. Electrician /
Supervisor (UK).

Duties included: Supervision on wiring and
fitting HV control panels for HV switchgear in substations  on
electrical plants mainly wind farms, assembly of electrical gears, steel
– work, wiring telecom boxes and all aspects of electrical
installations, LV Switchboards, Cables. Assisting during tests and
commissioning of HV switchgears.

E.J. Stone Ltd.
Maintenance Electrician (UK).

Duties included: Maintenance
of facility and operation of fully automatic production line forklift
driving, diagnosing and repairing electrical and mechanical
faults.

KER C.O Ltd. (Tele-informatics’
Firm) Electronic Surface Fitter and Programmer/Post-Production Quality
Controller. (Poland)

Duties included: Programming and
testing post production modules, quality control, repair errors and
faults during
production.